Plan this project in four steps

  1. Identify whether the project is a slab, footing, wall, or round column.
  2. Measure the finished dimensions and keep thickness units consistent.
  3. Add a project-appropriate extra allowance for site variation and placement.
  4. Convert the result to ready-mix order volume or bag quantity using the product yield.

Before you calculate

Measurements and product details to collect

  • Shape and finished dimensions
  • Thickness or diameter
  • Extra allowance
  • Supplier order increment or bag yield
  • Optional material price

Your project notes

Make a measurement checklist

Record real sizes and product details before using the calculators. Tick items as you check them, then download your notes to take shopping.

0 / 5checked

Use your own measurements

Send measured values to the calculator

Enter actual numbers here to avoid retyping in the calculator. Your free-text checklist notes remain separate.

Values transfer in this browser tab only. Nothing is uploaded.

No account needed. Your notes stay in this browser tab until downloaded.

Purchase planning comparison

A one-inch thickness change changes order volume substantially

This comparison uses an 18 × 10 ft rectangular slab and an illustrative 8% extra allowance. It shows arithmetic sensitivity; slab thickness must be determined by engineering, site and code requirements, not by the cheapest row.

Planning scenarioCalculationWhat it means
4 in finished thickness18 × 10 × (4 ÷ 12) ÷ 27 × 1.082.40 cubic yards
5 in finished thickness18 × 10 × (5 ÷ 12) ÷ 27 × 1.083.00 cubic yards
6 in finished thickness18 × 10 × (6 ÷ 12) ÷ 27 × 1.083.60 cubic yards

Buying decision: For the same slab footprint, each extra inch adds 0.60 cubic yards in this example (including the assumed 8%). Confirm irregular depths and order increments with the concrete supplier.

Before committing to an order

  • Measure excavated grade and actual form depth at several locations; one nominal number may hide uneven depth.
  • Confirm reinforcement, subbase, joint plan, delivery access and allowable placement conditions.
  • For bagged mixes, convert from the yield printed on the selected bag rather than assuming bag weight is volume.

Not covered: This comparison is not structural engineering or approval of slab thickness, soil bearing, reinforcement or curing procedure.

These are arithmetic planning comparisons with stated assumptions, not real project measurements, contractor advice, actual product prices or supplier quotations. Replace the examples with your own measurements and manufacturer specifications in the calculator.

Planning tip

Use real dimensions first, product labels second

Confirm utility locations, local permit requirements, reinforcement, curing conditions and access for ready-mix delivery. Geometric volume is not a structural design or a supplier delivery commitment.